Summary
Overview
Work history
Education
Skills
Certification
Work availability
Timeline
Generic
Paulo Guimaraes Conrado Junior

Paulo Guimaraes Conrado Junior

Kildare,Irlanda

Summary

A experienced and results-driven Civil Engineer with a comprehensive background in Full Project Lifecycle Management, from planning through execution and control. I consistently deliver projects within budgets, timelines, and quality standards, leveraging expertise in On-Site Supervision & Quality Assurance across diverse civil works. My commitment to Health, Safety & Environmental (HSE) Leadership is proven through robust policy implementation and risk mitigation on numerous sites.
I excel in Stakeholder & Team Coordination, fostering effective communication and leading multidisciplinary teams to achieve project objectives. My strong capabilities in Financial & Resource Optimisation ensure cost-efficient operations and waste minimisation. With significant Technical Proficiency & Problem Solving skills, including AutoCAD and MS Project, I adeptly address complex engineering challenges. My track record includes substantial Deliverables & Outcomes in railway infrastructure and commercial building projects, complemented by direct Experience in Ready-Mix Concrete and Laboratory operations, encompassing quality control and materials testingCivil Engineer experienced in construction management, team coordination, and project oversight. Expertise in budgeting and ensuring compliance with occupational and environmental safety standards. Skilled in structural and infrastructure systems, with a strong background in inspection, maintenance, and repairs. Proficient in civil engineering software including AutoCAD and Microsoft Office, as well as advanced surveying techniques using Leica Robotic Total Station.

Overview

18
18
years of professional experience
8056
8056
years of post-secondary education
1
1
Certification

Work history

Warehouse operator

J&S Automotive Ltda
Dublin, Ireland
05.2025 - Current
  • Optimized warehouse efficiency by maintaining organized and clean stock locations. I was responsible for the removal of waste generated by goods, contributing to operational order and safety.
  • Handled fragile goods with extreme care, minimizing damage during transport and movement operations. I ensured adherence to strict deadlines by efficiently processing incoming shipments.
  • Executed the strategic stacking of pallets, optimizing storage space and establishing an effective organizational system.
  • Performed order picking with high precision, significantly reducing instances of returns or exchanges due to errors.
  • Organized products in their designated areas, facilitating efficient access and retrieval of items as per demand.
  • Ensured compliance with all Health and Safety at Work (HSW) guidelines, actively contributing to a safe and productive work environment.
  • Communicated effectively with supervisors, enhancing overall workflow and promoting high standards of productivity and safety.
  • Carried out the sorting and directing of packages to execute picking and packing responsibilities with precision, meeting established targets.
  • Adapted and operated in full compliance with evolving safety, quality, and production standards.
  • Employed appropriate manual handling practices to routinely lift and move products weighing up to 23kg. I hold a " Manual Handling Course" certification valid until 2027.
  • Actively participated in Health and Safety training, ensuring consistent adherence to warehouse safety policies.

Production Operator / Cad Technician

Steel Tech Sheds
Tuam, Ireland
07.2024 - 04.2025
  • Developed 2D drawings using AutoCAD, adhering to technical standards and specifications.
  • Optimized production processes by converting rough sketches into finalized CAD designs.
  • Conducted detailed analyses of technical drawings to identify potential design flaws, thereby saving revision time.
  • Created precise floor plans and elevations, updating existing drawings as required.
  • Enhanced project efficiency by performing detailed CAD drawings and revisions.
  • Interpreted project plans to identify errors, proposing effective solutions in collaboration with engineers.
  • Organized technical drawings, maintaining a robust version control system for efficiency.
  • Standardized graphic elements to improve workflow processes across diverse projects.
  • Prepared materials for shed construction, utilizing various hand and power tools for assembly tasks.
  • Conducted inspections during and after assembly to ensure compliance with quality standards.
  • Facilitated smooth workflow by organizing materials for the production line.
  • Worked on the assembly line, producing high-quality goods.
  • Followed detailed assembly instructions, resulting in precise manufacturing outcomes.
  • Ensured product quality by adhering to company standards and regulations.
  • Maintained a clean and organized workplace while assisting with loading and unloading materials.
  • Maintained a safe work environment by following safety procedures.
  • Utilized hand and power tools to assemble parts efficiently.
  • Performed regular cleaning tasks, maintaining a hygienic manufacturing area.
  • Maintained a fast pace and attention to detail to meet productivity targets.
  • Used appropriate personal protective equipment (PPE) to minimize the risk of injury.
  • Collaborated closely with engineers for improved accuracy in design specifications.


Civil Engineer

CPTM - Companhia Paulista de Trens Metropolitanos
Sao Paulo, Brazil
05.2012 - 07.2023
  • Oversaw daily site operations, ensuring adherence to project costs and timelines. I evaluated construction techniques, standards, and technical specifications, alongside workplace safety, providing instruction and guidance on correct procedures and the use of personal and collective protective equipment.
  • Managed construction workers and subcontractors, coordinating activities to maintain quality standards. I conducted meetings concerning schedules, construction methodologies, financial control, and site safety.
  • Resolved on-site construction challenges, acting as a key liaison between stakeholders, including project managers and clients. I generated precise technical reports and critical project updates, informing decision-making on key events.
  • Implemented robust health and safety standards on site, developing EHS policies and conducting comprehensive risk assessments. I supervised work conditions related to chemical, physical, and biological risks, studied site environments, and was responsible for the analysis and issuance of critical documentation such as Permits to Work (PTW) and Preliminary Risk Assessments (PRA), among others.
  • Monitored project expenditures using Excel spreadsheets, analyzing variances and developing cost-reduction strategies through precise quantity surveying, identifying and minimizing site waste.
  • Inspected and analyzed existing structures, issuing detailed reports and providing expert testimony when required. As a result, I successfully delivered Railway Stations and kilometers of railway track, including overhead line equipment (OHLE) and signaling systems.
  • Supervised the issuance of necessary licenses and implemented comprehensive waste management plans to prevent contamination. I executed the correct disposal of contaminated materials with associated tracking documentation, undertaking necessary isolation and handling procedures for service execution, and controlled effluent contamination through rigorous testing and sustainability studies.
  • Utilized MS Project and AutoCAD for schedule tracking, project updates, and ensuring plan accuracy in construction activities.
  • Leveraged AutoCAD proficiently to create precise drawings, perform accurate quantity take-offs, and ensure multidisciplinary project coordination across structural, hydraulic, and system designs, among others.
  • Applied advanced problem-solving skills to effectively address complex engineering challenges, evaluating mitigation possibilities, control measures, and total remediation of occurrences.
  • Prepared accurate budget estimates for each project phase, facilitating sound financial planning. I developed control spreadsheets using Excel, identifying critical cost points and opportunities for savings.
  • Supervised comprehensive topographic surveys to guarantee precise construction planning, managing access to marking areas and controlling associated risks.
  • Estimated quantities and costs of materials, equipment, and labor requirements to determine project feasibility.
  • Tested sites and materials to assess strength and quality, conducting factory inspections and monitoring control tests and warranties.
  • Oversaw Quality Control (QC) for construction teams, delivering outcomes in strict alignment with project specifications.
  • Inspected completed civil works and documented safety and compliance findings, collating all information to generate the final Data Book.

Civil Engineer

Engebanc Engenharia e Servicos Ltda
Sao Paulo, Brazil
01.2011 - 05.2012
  • Managed all project phases, from planning through execution and control. This included defining project scopes, conducting feasibility analyses, assessing risks, and motivating and leading multidisciplinary teams. I also developed detailed project plans and cost estimates.
  • Established physical-financial schedules, setting clear deadlines for each project stage, and exercised decisive leadership to ensure desired outcomes.
  • Supervised project teams to ensure adherence to quality and safety standards during execution. This involved conducting regular meetings focused on planning, health & safety, and environmental considerations.
  • Monitored project progress, verifying compliance with technical specifications and project requirements. I was actively involved in site routines, tracking project evolution firsthand.
  • Ensured meticulous attention to detail in material quality and service delivery, conducting factory inspections and technical testing.
  • Maintained open and effective communication with clients, work teams, and stakeholders throughout projects, acting as a central liaison between multidisciplinary teams.
  • Delivered completed bank branches and commercial premises in São Paulo, enhancing surrounding landscapes and user accessibility through paving, landscaping, and accessibility improvements.
  • Optimized resource allocation, resulting in cost-efficient operations.
  • Ensured strict adherence to all health and safety regulations and technical specifications across all projects.
  • Implemented rigorous quality control measures, guaranteeing superior project outcomes.
  • Applied advanced problem-solving skills to effectively address complex engineering challenges. This involved mitigating risks, evaluating construction techniques, and maintaining clear and objective communication.
  • Prepared precise budget estimates for each project phase, aiding financial planning.
  • Monitored construction activities regularly, maintaining high-quality standards at all times.
  • Collaborated effectively with architects to develop optimal design solutions.
  • Provided expert civil engineering consultation to clients.
  • Visited sites to review work progress and drive continuous process improvements.
  • Estimated quantities and costs of materials, equipment, and labor requirements to determine project feasibility.
  • Tested sites and materials to assess strength and quality.
  • Oversaw Quality Control (QC) for construction teams, delivering results in line with project specifications.
  • Inspected completed civil works and documented safety and compliance findings. I also prepared technical reports and arranged for necessary survey or investigation work.
  • Built strong relationships with clients to maximize satisfaction and foster long-term business success.
  • Collaborated cross-functionally with technical and non-technical personnel to achieve project objectives.
  • Monitored and maintained high health and safety standards for site compliance.
  • Established project materials and methods to maximize construction productivity.
  • Completed complex technical surveys for large-scale developments.

Civil Engineer

Polimix Concreto Ltda
Itapolis, Sao Paulo, Brazil
02.2010 - 08.2010
  • Defined production goals and ensured deadlines were met while optimising resource utilisation.
  • Monitored quality of concrete and mortar, implementing corrective measures as needed.
  • Supervised dosing, mixing, and transportation services, ensuring equipment maintenance.
  • Conducted quality control tests to assess performance and consistency of products.
  • Coordinated production team activities, fostering motivation and training for employees.
  • Managed plant budget, monitoring production costs to identify reduction opportunities.
  • Traded with suppliers to secure quality materials at competitive prices while controlling stock.
  • Promoted accident prevention and minimised environmental impact through safety measures.
  • Developed intricate project schedules, facilitating smooth progress tracking.
  • Monitored construction activities regularly, maintaining high-quality standards at all times.
  • Managed resources efficiently to minimise waste during construction processes.
  • Optimised resource allocation, resulting in cost-efficient operations.
  • Executed stringent quality control measures, guaranteeing superior outcomes.
  • Visited sites to review work progress and drive process improvements.
  • Estimated quantities and cost of materials, equipment and labour requirements to determine project feasibility.
  • Tested sites and materials to assess strength and quality.
  • Enforced strict health, safety and environmental rules applicable to each project type.
  • Collaborated cross-functionally with technical and non-technical personnel to meet project objectives.
  • Prepared accurate project cost estimates, schedules and specifications.
  • Established project materials and methods to maximise construction productivity.
  • Minimised deviation from cost parameters through performance and budget monitoring.
  • Organised information and completed paperwork for technical bids to secure new contracts.
  • Reported on flood and environmental hazards and recommended mitigation strategies.

Laboratory Technician

Polimix Concreto Ltda
Barueri, Sao Paulo, Brazil
09.2009 - 02.2010
  • Collected concrete and mortar samples during production, adhering to technical procedures for optimal testing conditions.
  • Interpreted test results to ensure compliance with quality standards for cement, aggregates, and admixtures. This involved maintaining precise documentation, preparing technical reports, and compiling laboratory results for data-driven decision-making.
  • Conducted granulometry and density tests, while monitoring material stock levels and storage practices.
  • Ensured laboratory equipment was maintained and calibrated according to established protocols through regular maintenance.
  • Managed occupational safety by enforcing the use of personal protective equipment (PPE) within the laboratory.
  • Organized the laboratory environment, promoting cleanliness and adherence to safety regulations.
  • Disposed of waste responsibly, complying with environmental standards.
  • Collaborated proactively with team members, fostering a harmonious work environment.
  • Conducted comprehensive research to improve test results, increasing laboratory efficiency by performing routine lab tests on various samples.
  • Optimised specimen storage practices, thereby preserving their integrity for extended periods.
  • Ensured safety protocols were strictly followed to maintain a secure and hygienic working environment, reducing the risk of cross-contamination.
  • Managed and organized inventory to ensure the constant availability of necessary supplies.
  • Performed testing procedures according to agreed laboratory protocols.
  • Inspected the laboratory for safety to identify and rectify potential hazards.
  • · Tested products and raw materials against Quality Control (QC) standards.
  • · Monitored laboratory supplies, reordering stock to meet operational needs.
  • · Catalogued samples and specimens in organized systems.

Rail Maintenance Technician

METRÔ
São Paulo, Brazil
09.2007 - 08.2008
  • Prepared and transported materials, tools, and equipment for maintenance tasks.
  • Cleaned and organised work areas, ensuring efficient operations.
  • Removed debris and waste to maintain a safe environment.
  • Performed drainage system maintenance, including gutter and utility hole cleaning.
  • Assisted in signalling work zones with cones, signs, and safety devices.
  • Ensured safety by using personal protective equipment and isolating hazardous areas.
  • Received and stored materials and equipment efficiently.
  • Executed administrative tasks, including form completion and inventory control.
  • Undertook emergency call outs promptly, minimised delays in service provision.
  • Managed inventory of replacement parts, ensured availability during emergency repairs.
  • Conducted routine inspections, identified potential issues.
  • Maintained rail systems to ensure safe and efficient operation.
  • Installed new equipment for improved performance.
  • Repaired damaged parts with precision tools.
  • Complied with all health and safety regulations, maintained a safe workplace environment.
  • Completed preventative maintenance tasks for optimal system longevity.
  • Checked designs for potential risks and non-conformance issues with health and safety regulations.
  • Conducted post-construction inspections to guarantee conformity to agreed plans.

Civil Engineer Intern

METRÔ
Sao Paulo, Brazil
02.2007 - 09.2007
  • Monitored progress of construction projects, ensuring compliance with designs and schedules.
  • Conducted measurements of areas and volumes to support construction progress.
  • Assisted in earthworks, concreting, and installation processes using VCA, NATM, and SHIELD methodologies.
  • Verified quality of materials and services against technical standards.
  • Prepared technical reports detailing construction progress and test results.
  • Analysed civil engineering designs, identifying specifications and quantifying materials for budgets.
  • Performed material tests on concrete, soil, and asphalt in laboratory and field settings.
  • Maintained organised files and technical documents to support project management.
  • Conducted comprehensive site surveys to ensure accurate construction planning.
  • Monitored construction activities regularly, maintaining high-quality standards at all times.
  • Visited sites to review work progress and drive process improvements.
  • Inspected completed civil works and documented safety and compliance findings.
  • Prepared technical reports and arranged for survey or investigation work.
  • Worked on commercial and public works projects of different sizes using sound engineering principles and industry best practices for design.
  • Participated in training and seminars to enhance skills and promote growth.
  • Adapted to new situations and learned new skills quickly.
  • Collaborated with multidisciplinary teams to deliver projects within formal deadlines.
  • Wrote and edited articles for company's website.
  • Organised documentation and creatives to prepare for publication.

Education

MSc of Science - Forensic Engineering

Paulista University
Sao Paulo, Brazil
/2018 - 01.2019

MSc of Science - Health Safety & Environment Engineering

Mackenzie University
Sao Paulo, Brazil
/2014 - 01.2015

MSc of Science - Oil and Natural Gas Engineering

Oswaldo Cruz University
Sao Paulo, Brazil
/2011 - 01.2012

Bachelor’s degree - Civil Engineering

Armando Alvares Penteado University
Sao Paulo, Brazil

Skills

  • Resilience in high-pressure situations
  • Punctuality assurance
  • Manual handling
  • Team player
  • Attention to Detail
  • AutoCAD
  • Project Management
  • Microsoft Office Suite
  • Building construction knowledge
  • Technical reporting
  • Technical drawing

Certification

  • Safe pass – SOLAS Learning Works, Ireland, 2024
  • AutoCAD - AutoCAD 2D and 3D training
  • Training in Setting Out with Leica Robotic Total

Work availability

Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
morning
afternoon
evening
swipe to browse

Timeline

Warehouse operator

J&S Automotive Ltda
05.2025 - Current

Production Operator / Cad Technician

Steel Tech Sheds
07.2024 - 04.2025

Civil Engineer

CPTM - Companhia Paulista de Trens Metropolitanos
05.2012 - 07.2023

Civil Engineer

Engebanc Engenharia e Servicos Ltda
01.2011 - 05.2012

Civil Engineer

Polimix Concreto Ltda
02.2010 - 08.2010

Laboratory Technician

Polimix Concreto Ltda
09.2009 - 02.2010

Rail Maintenance Technician

METRÔ
09.2007 - 08.2008

Civil Engineer Intern

METRÔ
02.2007 - 09.2007

MSc of Science - Forensic Engineering

Paulista University
/2018 - 01.2019

MSc of Science - Health Safety & Environment Engineering

Mackenzie University
/2014 - 01.2015

MSc of Science - Oil and Natural Gas Engineering

Oswaldo Cruz University
/2011 - 01.2012

Bachelor’s degree - Civil Engineering

Armando Alvares Penteado University
Paulo Guimaraes Conrado Junior