Accomplished professional with expertise in orbital welding, TIG welding, and pipefitting, demonstrating proficiency. Adept at interpreting ISO drawings and implementing safe work methods to ensure high-quality results. Strong problem-solving skills enhance the ability to tackle complex challenges efficiently. Committed to advancing career goals by leveraging technical skills and industry knowledge to contribute effectively to team success.
Installed pipe racks to basement roof support by steelwork.
Fitted welded high-purity stainless steel and carbon piping systems.
Pressure-tested all installed pipework and welded risers from racks.
In this company i was installing stainless shed pipe and carbon pipe. i was installing and tig tacking all of the spools for the welders all sizes were used on this site biggest being 12 inch shed 80 we used chain blocks and come alongs to manoeuvre the spools into position we installed shoes and made sure the pipe had the correct fall according to the iso.
pipe fitted stainless and carbon spools to site installation requirements.
TIG tack and install 2 to 8 inch diameter pipe.
Position spools using chain blocks and come-alongs for accurate alignment.