Summary
Overview
Work History
Education
Skills
Timeline
Generic

Justin Clay Geurin

Lone Grove

Summary

Adept at enhancing operational efficiency, I streamlined assembly processes at Michelin Ardmore Manufacturing, significantly reducing waste. My expertise in machine maintenance and a continuous improvement mindset, coupled with exceptional teamwork and time management skills, consistently exceeded production quotas, underscoring my commitment to quality and excellence in every project undertaken.

Proven track record of assembling high-quality tires while maintaining safety and efficiency standards. Demonstrated expertise in operating tire building machinery and adhering to production schedules.

Overview

5
5
years of professional experience

Work History

Tire Builder

Michelin Ardmore Manufacturing
11.2020 - Current
  • Enhanced tire production efficiency by streamlining assembly processes and reducing waste.
  • Assisted in training new hires on proper tire building techniques, ensuring consistent quality standards across the team.
  • Maintained accurate records of daily production levels, allowing for effective tracking of team progress towards goals and objectives.
  • Consistently met or exceeded tire production quotas by maintaining a strong work ethic and excellent time management skills.

Fabrication Welder

Big Tex
02.2020 - 10.2020
  • Measured and cut metal pieces to correct length and angle to attain proper fit and alignment of pieces.
  • Maintained high-quality workmanship through consistent attention to detail and adherence to specifications.
  • Maintained clean and organized work area to prevent workplace accidents.
  • Read and followed blueprints and weld diagrams.
  • Finished welding and fabrication projects using grinders.
  • Utilized various tools, such as grinders and cutting torches, for proper preparation of materials prior to welding processes.
  • Used cutting torches to shape and cut metal for fabrication projects.
  • Demonstrated versatility in welding techniques, applying appropriate methods for each specific project requirement.
  • Communicated with supervisors and engineers to verify quality of finished work met specifications.

Drop Team

Winstar Casino
11.2019 - 02.2020
  • Contributed positively to departmental goals by consistently meeting or exceeding targets for speed and accuracy in drops performed daily.
  • Ensured timely completion of drop tasks, maintaining a strict adherence to schedules.
  • Collaborated with fellow team members to maintain high levels of security during the drop process.

Education

High School Diploma -

Lone Grove High School
Lone Grove, Oklahoma
05-2019

Skills

  • Training and mentoring
  • Machine maintenance
  • Quality control inspection
  • Continuous improvement mindset
  • Mold preparation proficiency
  • Teamwork
  • Time management

Timeline

Tire Builder

Michelin Ardmore Manufacturing
11.2020 - Current

Fabrication Welder

Big Tex
02.2020 - 10.2020

Drop Team

Winstar Casino
11.2019 - 02.2020

High School Diploma -

Lone Grove High School
Justin Clay Geurin