Experienced Setting Out Engineer. Main technical advisor on site for contractors, trades people and operatives. Responsible for setting out, leveling and surveying the site. Has a variety of setting out experience within many sectors and in addition to seeing jobs through to hand over he was also responsible for setting out for all drainage and groundwork's as well as piling, ground beams, RC floors, walls columns and beams. Demonstrating a keen ability for soil testing and precise GPS station operation, my contributions have significantly enhanced project efficiency and accuracy, embodying leadership and technical expertise in civil engineering projects.
Niall Toland, niall.toland@hays.ie, Limerick, 1414775, Experienced Setting Out Engineer. Previously worked on a €25 million project with Manley Construction Limited setting out for an Office Block in Ballsbridge, Dublin. Main technical advisor on site for contractors, trades people and operatives. Responsible for setting out, levelling and surveying the site. Has a variety of setting out experience within many sectors and in addition to seeing jobs through to hand over he was also responsible for setting out for all drainage and groundworks as well as piling, ground beams, RC floors, walls columns and beams. Previously worked on contract or in a permanent role for PJ Hegarty & Sons, Fleming Construction, McInerney Homes, Duggan Brothers, Michael McNamara & Company & Moston Construction. Competent in the use of Leica Total Robotic stations. Computer literate with a good working knowledge of AutoCad systems. Available to start a new role., Immediately Available, Flexible, €Negotiable, BSc in Building Management, Limerick RTC, 09/01/92, 06/30/95, Construction, Land Surveying, Structures, Law, Contract Law, Economics, CIF IOSH MANAGING SAFELY IN CONSTRUCTION, 01/01/16, The course covers a wide range of industry specific aspects including: Regulations; Safety Plans and Statements; Hazardous Substances; Electrical Hazards; Demolition; Risk Assessment; Communication in Health and Safety etc., Confined Spaces CGCS Training, Experience in supervising this type of work., SAFE PASS, 12/31/19, Manual Handling, 12/31/20, Site Engineer, Shareridge Civil Engineering, 03/01/24, 10/31/24, Cycle Path- Mill Road Corbally Limerick, Setting out of an active cycle path in Mill Road Corbally Limerick using Trimble gps and Trimble robotic Total Station. Duties included quality control for drawings and setting out including reports for concrete foundations for the stonework wall and laying of esb ducting for repositioning of street lighting including setting out of ESB mini-Pillars and Micro Pillars and as built surveys of all utilities., Completed Contract, Site Engineer, Connack Construction, 07/01/23, 12/31/23, Office Development – Carlow, Setting out a Office development for Carlow IT. Including stonework cladding, external landscaping and utilities installation and foul and stormwater drainage and waterman installation., Completed Contract, Site Engineer, Daniel Canty Construction, 04/01/23, 06/30/23, ESB substation, Setting out for ESB substation for a solar farm with associated ducting., Completed Contract, Site Engineer, PJ Hegartys, 01/01/23, 04/30/23, Working on a contract role., Completed Contract, Site Engineer, Geda Construction, 06/01/22, 01/31/23, Pumped Rising Mains in Ballyvolane county Cork and Midleton County Cork for Irish Water, Setting out Pumped Rising Mains in Ballyvolane county Cork and Midleton County Cork for Irish Water. The Ballyvollane project included 8 km of rising main and water main and a Waste Water Pumping Station. The Midleton project included 7 km of pumped rising sewer mains from Castlerock to Carrigtwohill., Completed Contract, Site Engineer, W&H Alexander Civil Engineering, 11/01/21, 06/30/22, Lisheen iii Derrygreenagh county Tipperary, Setting out on an extension to a windfarm including peat depth testing and floating road works and sheet piling in the peat for the turbine bases and setting out for the piling contractor., Completed Contract, Site Engineer, Michael Fitzgibbon Builders, 04/01/21, 11/30/21, Setting out Houses on two estates using leica gps., Completed Contract, Site Engineer, John Paul Construction, 12/01/19, 02/29/20, Setting out Groundworks and Concrete structures with Leica robot 50 and Leica GPS., Completed Contract, Site Engineer, BAM, 09/01/18, 12/31/19, Dairygold Cheese factory Mogeely, Co. Cork, Setting Out for Dairygold Cheese factory. Setting out of Groundworks. Completing Health and Safety Work Paperwork., Completed Contract, Site Engineer, PJ Hegarty, 08/01/18, 09/30/18, Ringsend Waste Water Treatment Plant, Setting Out of RC Concrete Works with Leica Robotic Total Station and /GPS. Completing Health and Safety Work Paperwork., Completed Contract, Site Engineer, Wills Bros, 07/01/18, 07/31/18, Bandon Flood Relief Scheme, Setting out Bandon Flood Relief Scheme. Competent in the use of Topcon GPS. Supervising Pouring a Fish Path from the River Bandon to a local stream., Completed Contract, Site Engineer, Rhatigans, 04/01/18, 07/31/18, National Forensic Mental Health Service, Portrane, Dublin, QA and management of site diary. Setting out and site management of foundation pads, drainage and cladding. Co-ordinating Utility drawings with grounds work contractor., Completed Contract, Site Engineer, Duggan Brothers, 11/01/17, 04/30/18, UCD Extension to Lochlann Quinn School of Business, Maintaining site records and quality assurance documentation. Monitoring and evaluating quality control for subcontractor’s work. Coordinating site drawings., Completed Contract, Site Engineer, Manley Construction, 04/01/17, 10/31/17, Office Block, Ballsbridge, Dublin, Acting as the main technical adviser on a construction site for subcontractors, trades people and operatives. Setting out, leveling and surveying the site. Checking plans, drawings and quantities for accuracy of calculations. Liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project., Completed Contract, Site Engineer, Moston Construction Ltd, 01/01/17, 03/31/17, Large Domestic Home in Howth, Dublin, Setting out for piling, ground beams, RC floors, walls, columns & beams. Setting out for all drainage & groundworks., Completed Contract, Quantity Surveyor, PAUL RYAN QUANTITY SURVEYORS, 01/01/10, 12/31/16, Provide property tax depreciation schedules to claim against rental properties in Ireland. Survey properties in Ireland taking photos of any items to be depreciated both inside and outside., Site Engineer, Zoey Development (O Carrolls), 12/01/07, 05/31/08, Shopping Centre, Dublin Road, Limerick, Setting out on Multi Storey Steel Framed Shopping Centre., Completed Contract, Site Engineer, McInerney Homes, 06/01/07, 12/31/07, Travel Lodge Hotel with Retail Park, Dublin Road, Limerick, Liaising and reporting to the Contracts Manager. Set out fast track hotel and retail park., Completed Contract, Site Engineer, Michael McNamara & Company, 09/01/06, 05/31/07, Hilton Hotel Limerick, To read architects and engineers drawings and make any RFI’s necessary to ensure correct information is being used to coordinate with sub-contractors., Completed Contract, Site Engineer, McInerney Homes, 03/01/05, 09/30/06, New Roadway for Alandale, Set out new road into Allendale with associated drainage and other site works., Completed Contract, Site Engineer, Fleming Construction, 06/01/03, 03/31/05, Student Village in Moylish College Limerick, To set out and supervise the construction of fusion steel framed apartments and houses., Completed Contract, Site Engineer, PJ Hegarty & Sons, 01/01/00, 12/31/03, Dunnes Stores, Henry Street, Limerick, Responsible for setting out, day-to-day management of the site., Completed Contract, Site Engineer, BAM Construct UK Ltd, 01/01/96, 06/30/00, Refurbishment project on Selfridges Oxford Street, Installing escalators and opening the space to improve circulation., Completed Contract, Site Engineer, McAlpine/Laing, 01/01/96, 12/31/97, External groundworks at the Millennium Dome, Completed Contract, Site Engineer, John Mowlem Construction, 01/01/96, 12/31/96, New build office development, Completed Contract